What a Composite Deck Costs and How Long It Takes
Projects start at $10,000 and most land between $15,000 and $45,000. Here is what moves the number, and what the calendar looks like from signed contract to final walkthrough.

From Contract to Walkthrough
Free In-Home Consultation
We measure, talk through the design, show you material samples and give you a ballpark range. A formal proposal with line-item pricing follows.
Drawings: 1 to 2 Weeks
After you sign, a licensed architect draws the plans and we prepare the HOA paperwork.
Township Permit: 4 to 8 Weeks
We submit the permit and coordinate every inspection.
Installation: 1 to 3 Weeks
A new build takes 1 to 3 weeks. A resurface takes about 4 weeks from signed contract to finished deck.
Final Walkthrough
We walk the finished project with you before final payment.
What Sets the Price
Size and Height
A small ground-level deck starts around $10,000. Larger, raised, covered or premium-board decks run $30,000 to $80,000.
New Deck or Resurface
Resurfaces run $10,000 to $50,000, depending on how much of the frame has to be rebuilt after the code upgrades.
Framing and Footings
We frame with #1 grade pressure-treated lumber, use butyl tape on the ledger and joists, and install helical pier footings where they fit.
Railing
Aluminum and vinyl systems price very differently, so the railing you choose moves the number.
Covered Structures
Roofs, gables and screened porches are scoped as their own line.
Permits and Drawings
Architect drawings, township permits and HOA paperwork are handled and itemized.
Priced Fairly the First Time
We are not the cheapest and not the most expensive. If a number needs to come down, the scope changes: a smaller footprint, a different board, no covered structure. Every proposal is line by line.
Financing Available
HFS Financial and Hearth, with a soft credit pre-qualification. Hearth offers 0% interest for up to 18 months, depending on qualification.
Frequently Asked Questions
How much does a composite deck cost?
Projects start at $10,000, and most land between $15,000 and $45,000. Size, height off the ground, framing condition, railing, covered structures and the board you choose set the final number, and every proposal itemizes them. See what sets the price .
How long does a typical project take to complete?
Plan on drawings taking 1 to 2 weeks and the township permit taking 4 to 8 weeks, then 1 to 3 weeks of installation for a new build. A resurface takes about 4 weeks from signed contract to finished deck.
Do you offer financing?
Yes, through HFS Financial and Hearth. Pre-qualification is a soft credit check with no impact on your score, and Hearth offers 0% interest for up to 18 months depending on your qualification.